Case studies

Commercial projects with documented outcomes

Detailed briefs covering engineering constraints, interconnection pathway, commissioning documentation, and portfolio reporting—structured for stakeholder review.

System sizing · Interconnection scope · ROI outcomes
Industrial rooftop solar installation on a large logistics facility
Newark, NJ · Distribution & fulfillment center
1.2MW Rooftop Grid for a Northeast Logistics Hub
NorthRiver Logistics
Commissioned Q4 2025

A high-density rooftop system engineered for wind exposure, tight loading constraints, and accelerated interconnection timelines—delivering predictable generation for a mission-critical facility.

System size
1.20MW
Payback
4.8 yrs
5-year savings
$1,720,000
Panels: 2,210 · Interconnection: 13.2 kV
View full project brief →
Rooftop solar on a commercial cold-storage warehouse
Dallas, TX · Refrigerated warehouse & logistics
0.98MW Cold-Storage Rooftop System with Demand Management
Atlas Cold Storage
Commissioned Q3 2025

A cold-storage facility required consistent output and strict power-quality management. The system was designed to support predictable savings while preserving refrigeration reliability.

System size
0.98MW
Payback
4.3 yrs
5-year savings
$1,810,000
Panels: 1,790 · Interconnection: 12.47 kV
View full project brief →
Large solar array adjacent to a commercial manufacturing facility
Phoenix, AZ · Advanced manufacturing campus
2.05MW Manufacturing Campus System with Utility-Scale Discipline
Vantage Manufacturing
Commissioned Q1 2026

A multi-building campus required consistent design standards, accelerated schedule control, and grid-support capabilities. The result is a system built for long-term operational stability and transparent reporting.

System size
2.05MW
Payback
4.9 yrs
5-year savings
$2,860,000
Panels: 3,725 · Interconnection: 34.5 kV
View full project brief →
Commercial rooftop solar array near a port warehouse complex
Savannah, GA · Port-adjacent warehouse complex
1.05MW Port Warehouse System Built for Interconnection Certainty
HarborLine Warehousing
Commissioned Q2 2025

A port facility demands schedule discipline and clear interconnection outcomes. This project combined tight construction sequencing with documentation-grade commissioning to de-risk acceptance.

System size
1.05MW
Payback
4.6 yrs
5-year savings
$1,900,000
Panels: 1,910 · Interconnection: 13.2 kV
View full project brief →